Preston Bezant

Austin, Texas

Senior product designer, 10+ years, enterprise product experiences at Visa and Lowe's and 0→1 products since. I start by working out who actually has to use the thing and what they can act on — then I build it, because a prototype you can put in front of someone answers questions a spec never will.

I work best when the problem is ambiguous and something real needs to exist at the end of it.

Preston Bezant

Product Design

10+ years of UX, product thinking, and design systems — enterprise at Visa & Lowe's and 0→1 products.

Research & Iteration

Competitive analysis, field research, and testing against real conditions — I define who I'm designing for, then keep going back to check.

Designs That Get Built

AI-native workflows — Claude, Cursor, VS Code, Antigravity — turn my designs into deployed prototypes I can actually put in front of people.

Sense Engine operator dashboard showing device fleet

Operator UX · Requirements to Deployment

Sense Engine: Where Is It, at a Glance

Supervisors had 200 tagged devices across three vendors and no way to answer "where is it?" They needed a zone and an aisle, not radio data. I hid five positioning methods behind one dot on a floor plan and let supervisors set up zones and alerts themselves, then validated it in a directed AI-assisted build across a 50,000 sq ft facility.

3
Vendor streams unified
200
Active devices tracked
50k
Sq ft coverage
5
Positioning methods, one map view
Read the Case Study→
AI contract review wireframes showing four layout directions
Take-Home ExerciseLegal AI · 2026

AI Contract Review — Triage & Trust

The brief asked for one low-fidelity frame. The real question — where AI findings should live relative to the document — is not answerable with one frame, so I carried four competing layouts through the same three states and annotated the tradeoff on each. It ends on the three things I would test first, not on a recommendation.

4
Competing directions
14
Annotated frames
3
States compared across all four
3
Open questions to test
Read the Case Study→
Mission Control agentic developer portal interface

Design Challenge

Mission Control — Agentic Developer Portal

Six divergent design directions explored, one shipped. A full-fidelity, working prototype for an AI-native developer portal — streaming agent traces, real-time execution, and PR review built for dev handoff.

6
Directions explored
Deployed
Working prototype
Streaming
Agent traces
PR review
Dev handoff built
Read the Case Study→
Who Reps Me search results showing federal, state, and local officials
Civic TechPersonal Project · 2026

Who Reps Me? Every Official Who Represents You

Google shut down the only free way to look up local officials in April 2025, and everyone left charges for it. I designed one address search that reaches from Congress to city council, with ZIP and city searches handled instead of silently failing, on free tiers and static files.

450
Officials
24
States
$0/mo
Infrastructure
0
Databases
Read the Case Study→
WLED Cloud fleet dashboard showing devices across venues

Operator UX · StructureSense

WLED Cloud: One Dashboard for Every Light

Facilities managers and installers run city lighting on sites with and without Wi-Fi. I designed one control surface where the radio disappears: pick a device, pick a color, and the platform decides how the command gets there. Roles take controls away instead of adding screens.

2
Radios, one control surface
4
Roles on the same screen
3
Network servers supported
Minutes
Box to online
Read the Case Study→

Projects

Software systems, IoT hardware, firmware, and production apps.